Home         About CEDA         Events         Members         Projects         News       Photo Gallery         Store        Contact Us
   

 

 

-Graveling of the parking lot.

-Refurbishing/remodeling of Eastman Lodge including:

Custom fit, aluminum thermal pane windows;

 2 high efficiency furnaces and associated duct work;

New fire escape door for the loft;

Tuck-pointing the interior and exterior of the building;

Replacement of the lower level floor in the kitchen, main room, and office;

Reconstruction of the fireplace;

Kitchen remodeling;

New kitchen appliances;

Commercial grade ventilation hood;

New stainless steel sink and work areas;

Remodeling of the loft area;

Installation of a new roof;

Remodel and upgrade of the restroom facilities;

Landscaping;

Collecting and installing displays of scouting memorabilia;

Clearing of brush and trees around the lodge;

Replacing the front and side walkways creating barrier-free access.

-Refurbish and restore the camp fire bell

-Removal of numerous trees and over 100 tree stumps.

-Repair and blacktop of camp roads

-Construction of a Vending Center

-Creation of a memorial tree program / arboretum (27 trees planted to date)

-Expansion/Improvement of the Trading Post including:

Shelter addition;

Lighting and electrical work;

New entry/exit doors;

New roofing;

Exterior paint;

Concrete sidewalk from the new addition to the driveway

Window repair/reconstruction.

-Expansion of the waterfront program area including:

Construction of a new boathouse with electricity;

New observation tower;

Purchase of boats for the program:

6 kayaks;

A catamaran sailboat;

A ski boat with motor;

New boat docks;

New buddy board;

Other equipment required to operate a safe and exciting waterfront program.

-Sports Recreation area improvements including:

New basketball court and goals;

2 sand volleyball pits, nets, and equipment;

Soccer goals nets, and equipment.

-Construction of the Scoutcraft Shelter.

-Construction of the Archery Range and waiting shelter.

-Construction of tent platforms in the staff area.

-Installation of a concrete flag pole pad including a vault for the new time capsule.

-Construction of a Low-Level and High-Level COPE Course including:

Purchase of all construction materials and tools needed;

Construction of events;

COPE Storage Building construction

Purchase of all COPE equipment,

COPE director training costs;

Promotional materials;

Purchase of participant awards.

-Purchase and installation of 4 large park-style grills throughout camp.

-Construction of log benches in the T-2-1 and staff areas.

-Construction of pole shelters near the Admin shelter, T-2-1, Handicraft, and the Wrens campsite.

-College scholarships awarded to Camp Staff.

-Camperships awarded to deserving Scouts.

-Monetary Donation to the Mississippi Valley Council toward the pool office/health lodge construction fund.

-Installation of 2 drinking fountains in the commons area of camp

-Construction of bulletin boards for campsites

-Construction and installation of routered signs at campsites, program areas, and camp landmarks